CHAPTER 3

RADIATION PROTECTION AT PROJECT TRINITY

The TR-7 or Medical Group, shown in the figure 1-5 organizational

chart, was responsible for radiological safety at Project TRINITY.

Many of the physicians and scientists in the Medical Group had worked

with radioactive materials before and were trained in radiological

safety procedures. The Chief of the Medical Group supervised the

radiological safety operations and reported to the TRINITY director.

In addition to providing medical care to TRINITY personnel, this group

established radiological safety programs to:

o Minimize radiation exposure of personnel on the test site and in

offsite areas

o Provide monitors to conduct radiological surveys onsite and offsite

o Provide and maintain radiation detection instruments

o Provide protective clothing and equipment.

An exposure limit of 5 roentgens during a two-month period was

established. Personnel were provided with radiation detection

instruments to determine their exposures (1).

3.1 ORGANIZATION

The Medical Group consisted of physicians, scientists, and

administrators, as well as radiological monitors. Many of these

personnel were nonmilitary, but all worked on the Manhattan Project

under the administration of the Army Corps of Engineers Manhattan

Engineer District.

The Medical Group was divided into two monitoring groups, the Site

Monitoring Group, which was responsible for onsite monitoring, and the

Offsite Monitoring Group. Each reported to the Chief of the Medical

Group, and each communicated with the other during the monitoring

activities. In addition to these two groups, a small group of medical

technicians provided radiation detection instruments to Medical Group

personnel (1; 10).

3.2 SITE MONITORING GROUP

The Site Monitoring Group consisted of a chief monitor, three other

monitors, and several medical doctors. This group had the following

functions (1; 10):

o Conduct ground surveys of the test area and mark areas of

radioactivity

o Conduct surveys of the Base Camp and roads leading into the test

area

o Provide protective clothing and equipment, including film badges and

pocket dosimeters, to personnel

o Monitor all personnel for radioactive contamination and provide for

their decontamination

o Maintain a record of radiation exposures received by personnel.

The Site Monitoring Group monitored the radiation exposures of

personnel in the test area. The time spent by personnel in radiation

areas was limited, and radiation detection instruments were provided

to permit continuous monitoring of exposure rates. In many cases, a

monitor from the Site Monitoring Group accompanied project personnel

into the test area to monitor exposure rates (1; 10).

Two members of the Site Monitoring Group, a monitor and a physician

with radiological safety training, were assigned to each shelter. The

supervising monitor was stationed at the Base Camp and was in radio

and telephone communication with all three shelters and the offsite

ground and aerial survey teams. Before any personnel were allowed to

leave the shelter areas, a radiological safety monitor and a military

policeman from each shelter advanced along the roads to Broadway to

check radiation levels. They wore respirators to prevent them from

inhaling radioactive material (1; 10).

Since it was expected that any dust from the cloud would fall on one

of the shelter areas within 30 minutes of the shot, plans had been

made to evacuate personnel as soon as the monitors completed their

initial survey. Because the cloud moved to the northeast, the south

shelter (the Control Point) was not completely evacuated, although

nonessential personnel were sent to the Base Camp. The west shelter

was emptied of all personnel except a searchlight crew spotlighting

the cloud as it moved away (1; 10).

Only at the north shelter did an emergency evacuation occur. About 12

minutes after the shot, a detection instrument indicated a rapid rise

in the radiation levels within the shelter. At the same time, a

remote ionization monitoring device detected a rapid increase in

radiation. Because of these two readings, all north shelter personnel

were immediately evacuated to the Base Camp, 25 kilometers to the

south. Film badges worn by personnel stationed at the north shelter,

however, showed no radiation exposure above the detectable level. It

was later discovered that the meter of the detector in the north

shelter had not retained its zero calibration setting, and radiation

at the north shelter had not reached levels high enough to result in

measurable exposures of the personnel who had been positioned there.

However, fallout activity was later detected in the north shelter

area, proof that part of the cloud did head in that direction. This

also explains why the monitoring device detected rising radiation

levels (1; 12).

After ascertaining that radiation levels along the roads leading from

the shelters to Broadway were within acceptable limits, the

radiological safety monitors and military police established

roadblocks at important intersections leading to ground zero. The

north shelter monitor and military police set up a post where the

North Shelter Road ran into Broadway. The west shelter monitor and a

military policeman blocked Vatican Road where it intersected Broadway.

The south shelter monitor and military police set up a roadblock where

Broadway intersected Pennsylvania Avenue (1).

The monitor assigned to Guard Post 4 surveyed the Mockingbird Gap area

to ensure that it was safe for the guards to return to their post.

This position controlled access to the McDonald Ranch Road, which led

directly to ground zero (1).

At 0540 hours, the chief monitor departed from the Base Camp with a

military policeman to monitor the entire length of Broadway. They

first checked the roadblock at Pennsylvania Avenue and Broadway. Next

they drove to the roadblock at Vatican Road and Broadway. Upon the

chief monitor's arrival, the west shelter monitor traveled about nine

kilometers west on Vatican Road to monitor Guard Post 1 so that the

military police could reoccupy the post. The monitoring excursion to

Guard Post 1 continued until the chief monitor had returned from Guard

Post 2, located 17 kilometers northwest of the Vatican Road roadblock

on Broadway (1; 18).

The chief monitor arrived at Guard Post 2 at about 0550 hours and

found the post empty. He then continued five kilometers north along

Broadway to the foxholes from which the military police had watched

the detonation. There he found the guards, the five radiological

safety monitors assigned to the evacuation detachment, and the

Commanding Officer of the evacuation detachment (1; 18).

The military policemen refused to return to Guard Post 2, insisting

that they had received orders over their two-way radio from the Base

Commander to evacuate their post and head for San Antonio, New Mexico,

a town 28 kilometers northwest of the Guard Post. The Base Commander

had noted that portions of the cloud were heading northwestward and,

fearing that fallout from the cloud would contaminate Guard Post 2,

had ordered the military police to evacuate. The chief monitor,

however, had found no significant radiation levels anywhere along the

northern part of Broadway nor around Guard Post 2. The Base Commander,

after being contacted by the chief monitor, drove to the foxholes and

ordered the guards to return to their post. This was the only

unplanned incident during the onsite monitoring (1).

After Guard Post 2 was reoccupied, the chief monitor returned to the

roadblock at the intersection of Broadway and the North Shelter Road.

The north shelter monitor informed the chief monitor of the sudden

evacuation of the north shelter, whereupon the chief monitor surveyed

the north shelter area and found intensities of only 0.01 and 0.02

roentgens per hour (R/h). The chief monitor then contacted the south

shelter and informed Dr. Bainbridge that the north shelter region was

safe for those who needed to return, that Broadway was safe from the

Base Camp to Guard Post 2, and that Guard Post 2 was now manned so

that personnel leaving for LASL could be checked out (1).

The chief monitor then returned to the south shelter and assembled the

monitors from the three roadblocks and Guard Post 4 to prepare for

entrance into the ground zero area. The time was about 0815 hours.

The military police at the roadblocks were given radiation meters to

survey the adjoining area. Broadway from the south shelter to Guard

Post 2 was remonitored occasionally to reassure the military police

that there was no radiation problem. Monitors also surveyed the Base

Camp for 24 hours after the detonation. No radiation above background

levels was detected there (1).

The following brief description of the radiological environment in the

TRINITY test area is based primarily on the results of the remote

gamma recorders situated in the test area and on results of the road

surveys conducted after the detonation (1).

Within about 1,400 meters of ground zero (except to the north),

radiation intensities between 0.2 and 1.3 R/h were detected during the

first few minutes after the detonation. These readings decreased to

less than 0.1 R/h within a few hours. At greater distances to the

east, south, and west, radiation levels above background were not

detected (1).

The cloud drifted to the northeast, and higher gamma readings due to

fallout were encountered in this direction. About five minutes after

the detonation, a reading of 3 R/h was recorded 1,400 meters north of

ground zero. Several minutes later, the intensity there had increased

to greater than 7 R/h, and it continued to increase for several more

minutes. Gamma detectors 9,150 meters north of ground zero, however,

recorded no radiation above background levels. This indicated that

the cloud had passed over or near the 1,400-meter area and only

partially over the 9,150-meter area where the north shelter was

located. Subsequent ground surveys of this area found no gamma

intensities higher than 0.02 R/h (1).

Gamma radiation levels at and around ground zero were much higher than

in other onsite areas because of induced activity in the soil.

Twenty-four hours after the detonation, the gamma intensity at ground

zero was estimated to be 600 to 700 R/h. This estimate was based on

data provided by the tank crew that drove to ground zero to obtain

soil samples. The intensity decreased to about 2 R/h at 725 meters

from ground zero. Gamma intensities of 0.1 R/h or more were confined

within a circular area extending about 1,100 meters from ground zero

(except in areas of fallout). One week after the shot, the gamma

intensity at ground zero was about 45 R/h. After 30 days, intensities

at ground zero had decreased to 15 R/h, and intensities of 0.1 R/h or

more were not encountered beyond about 365 meters from ground zero.

Gamma intensities of 3 to 10 R/h were found at ground zero three

months after the detonation (1; 19).

3.3 OFFSITE MONITORING GROUP

Four two-man teams and one five-man team supervised by the chief

offsite monitor constituted the Offsite Monitoring Group. Before the

detonation, the four two-man teams established monitoring posts in

towns outside the test area. These towns were Nogal, Roswell, Fort

Sumner, and Socorro, all in New Mexico. The five-man team remained at

Guard Post 2 to assist in evacuation of nearby residences if the

TRINITY cloud drifted in that direction. These residences, the Fite

house and the homes in the town of Tokay, were 24 and 32 kilometers

northwest of ground zero, respectively. Since the cloud drifted to

the northeast, evacuation was not required. All offsite monitoring

teams were in radio or telephone contact with personnel at the Base

Camp (11).

Offsite monitoring teams in areas northeast of ground zero encountered

gamma readings ranging from 1.5 to 15 R/h two to four hours after the

detonation. Three hours after the detonation, surveys taken in

Bingham, New Mexico (located 30 kilometers northeast of ground zero)

found gamma intensities of about 1.5 R/h. Radiation readings at the

town of White, nine kilometers southeast of Bingham, were 6.5 R/h

three hours after the detonation and 2.5 R/h two hours later. Another

team monitoring in a canyon 11 kilometers east of Bingham found a

gamma intensity of about 15 R/h. Five hours later, the intensity had

decreased to 3.8 R/h. It was estimated that peak intensities of gamma

radiation from fallout on shot-day were about 7 R/h at an occupied

ranch house in this canyon area (1; 11; 19).

Monitoring teams resurveyed these towns about one month after the

TRINITY detonation. At Bingham, gamma readings of 0.003 R/h and

0.0001 R/h were found at ground level outdoors and at waist level

inside a building, respectively. At the town of White, the highest

outdoor gamma reading was 0.008 R/h. Inside a building, the highest

reading was 0.0005 R/h (11).

Surveys taken in the canyon area one month after the detonation

indicated that gamma intensities at ground level had decreased to

0.032 R/h. The occupied ranch house was also surveyed, both inside

and outside. The highest reading outdoors was 0.028 R/h, and the

highest reading indoors was 0.004 R/h (11; 19).

Monitoring was also conducted in offsite areas other than those to the

north and northeast of ground zero. Monitors found no radiation

readings above background levels (11).

Significant fallout from the TRINITY cloud did not reach the ground

within about 20 kilometers northeast of ground zero. From this point,

the fallout pattern extended out 160 kilometers and was 48 kilometers

wide. Gamma intensities up to 15 R/h were measured in this region

several hours after the detonation. One month later, intensities had

declined to 0.032 R/h or less (11).

Project Trinity, 1945-1946 · 第 3 / 4 章