THE POWER HOUSE

The engine room is located on the main street of the institution, and it

is here that power is generated for driving the immense lines of shafting

that radiate through the several departments. The power plant is in charge

of a chief engineer and several inmate assistants, two of whom are life

prisoners, one having charge of the big engine and the other attending to

the electric light plant. Both men are under considerable responsibility,

but they are conscientious workers and have little difficulty in

performing their duties satisfactorily.

The chief engineer has charge of the automatic sprinkling plant, engine,

steam heating, ventilating, cooking, electric light plant, water supply

and all the machinery pertaining thereto. Each of the cells contains an

eight‐candle power lamp, and the shops and streets are provided with

electric lights so that the inmates can see to work during the winter

months. As they are employed from seven in the morning until six in the

evening the year around, lights are often necessitated.

Convict Life at the Minnesota State Prison, Stillwater, Minnesota · 第 114 / 148 题