CHAPTER III

THE SHIP, THE HUT AND OTHER NECESSITIES

Before I left Norway I visited Sandyfjord to see whether I

could come to terms with Mr. C. Christiansen, the owner of the _Bjorn_,

a ship specially built for polar work; but much as I wished to try her

I could not afford to pay the price.

So when I returned to London I purchased the _Nimrod_. She was small

and old, and her maximum speed under steam was hardly more than six

knots, but on the other hand she was able to face rough treatment in

the ice. I confess that I was disappointed when I first examined the

little ship, to which I was about to commit the hopes and aspirations

of many years, but I had not then become acquainted with her many

good qualities, and my first impression scarcely did justice to the

plucky old ship. She was at once put into the hands of Messrs. R.

& H. Green of Blackwall, the famous firm that had built so many of

Britain's "wooden walls," and that had done fitting and repairing work

for several other polar expeditions, and day by day she assumed a more

satisfactory appearance. Quarters were provided for the scientific

staff of the expedition by enclosing a portion of the after-hold and

constructing cabins which were entered by a steep ladder from the

deck-house. For some reason not on record these small quarters were

known later as "Oyster Alley."

As however the _Nimrod_, after landing the shore-party with stores and

equipment, would return to New Zealand, it was necessary that we should

have a reliable hut in which to live during the Antarctic night, and

until the sledging journeys began in the following spring.

THE HUT

I ordered a hut (which was to be our only refuge from furious

blizzards) measuring externally 33 ft. by 19 ft. by 8 ft. to the eaves

from Messrs. Humphreys of Knightsbridge. It was specially constructed

to my order, and after being erected and inspected in London was

shipped in sections.

It was made of stout fir timbering of best quality in walls, roofs and

floors, and the parts were all morticed and tenoned to make erection

easy in the Antarctic. Great precautions were taken against the extreme

cold, and the hut was to be erected on wooden piles let into the ground

or ice, and rings were fixed to the top of the roof so that guy-ropes

might be used to give additional resistance to the gales. The hut had

two doors, connected by a small porch, so that ingress or egress would

not cause a draught of cold air, and the windows were double so that

the warmth of the hut might be retained. We took little furniture as I

proposed to use cases for the construction of benches, beds, and other

necessary articles of internal equipment. The hut was to be lighted

with acetylene gas, and we took a generator, the necessary piping and a

supply of carbide.

We also took a cooking-range, manufactured by Messrs. Smith and

Wellstrood, of London, which had a fire chamber designed to burn

anthracite coal continuously day and night.

CLOTHING

Each member of the expedition was supplied with two winter suits made

of heavy blue pilot cloth, lined with Jaeger fleece. An outer suit of

windproof material is necessary in the polar regions, and I secured

twenty-four suits of Burberry gabardine. The underclothing was obtained

from the Dr. Jaeger Sanitary Woollen Company.

PONIES, DOGS, AND MOTOR-CAR

I decided to take ponies, dogs, and a car to assist in hauling our

sledges on long journeys, but my hopes were mainly based on the ponies.

Dogs had not proved satisfactory on the Barrier surface, but I was sure

that the hardy ponies used in Northern China and Manchuria would be

useful if landed in good condition on the ice. They had done good work

both on the Jackson-Harmsworth expedition and in the Russo-Japanese

War. Fifteen of these ponies, practically unbroken and about fourteen

hands high, were selected and ultimately transferred to Quail Island in

Port Lyttelton, where they were free to feed in luxury until they were

required.

[Illustration: Their Majesties King Edward and Queen Alexandra

inspecting the Equipment on the "Nimrod" at Cowes, (_See page 26_)]

As I thought it possible, from my previous experience, that we might

find a hard surface on the Great Ice Barrier, I resolved to take a

motor-car, so I selected a 12-15 horse-power New Arrol-Johnston car,

fitted with a specially designed air-cooled four-cylinder engine and

Simms Bosch magneto ignition. A non-freezing oil was prepared for me

by Messrs. Price and Company. I placed, as I have suggested, but small

reliance on dogs; I did however order forty of the descendants of the

Siberian dogs used on the Newnes-Borchgrevink expedition. The breeder

was only able to let me have nine, but this team proved sufficient for

my purposes.

SCIENTIFIC INSTRUMENTS

On the scientific side the equipment of a polar expedition is very

costly, and I felt the pinch of necessary economies in this branch.

I was, however, greatly assisted by loans of instruments and charts

from the Admiralty; the Royal Geographical Society lent me three

chronometer watches, and three wardens of the Skinners' Company gave me

one chronometer watch which accompanied me on my journey to the Pole

and which proved to be the most accurate of all. We also took with us a

photographic equipment which included nine cameras, and a cinematograph

machine in order that we might place on record the curious movements of

seals and penguins.

For the rest I had tried to provide for every contingency, and the

gear ranged from needles and nails to a Remington typewriter and two

Singer sewing machines. There was also a gramophone and a complete

printing-press; and even hockey-sticks and a football were not

forgotten.

Shackleton in the Antarctic: Being the story of the British Antarctic expedition, 1907-1909 · 第 3 / 47 章