INDEX

NOTE.—In this volume, each Section is complete in itself and has a

number. This number is printed at the top of every page of the Section

in the headline opposite the page number, and to distinguish the

Section number from the page number, the Section number is preceded

by a section mark (§). In order to find a reference, glance along the

inside edges of the headlines until the desired Section number is

found, then along the page numbers of that Section until the desired

page is found. Thus, to find the reference “Anchors, Screw, §55, p16,”

turn to the Section marked §55, and then to page 16 of that Section.

A

Allowance for hardware, §55, p147

Anchors, Screw, §55, p16

Application of hardware, §55, p151

Arches, Cost of terra-cotta floor, §60, p35

Ash disposal in factories, §64, p42

Ashlar, §61, p6

and cut stone, Cost of, §60, p26

Cost of, §61, p6

or cut stone, Estimating cost of, §60, p28

Asylum and prison locks, §55, p64

Automatic sprinkler system in factories, §64, p53

B

Bank and safe locks, §55, p66

Barb nails, §55, p9

Barbed dowel-pin, §55, p10

Base plates, §64, p13

Baseboards, rails, and moldings, Cost of, §60, p67

Beams and girders, Concrete, §64, p26

and girders in mill construction, §64, p34

Blind and shutter hinges, §55, p38

Blocks, Cost of concrete building, §60, p23

Board measure, §60, p38

Boiler room in factories, §64, p41

-room planning in factories, §64, p41

Bolts and screws, §55, p11

Casement, §55, p93

Chain, §55, p110

Cremorne, §55, p95

Door, §55, p108

Espagnolette, §55, p96

Expansion, §55, p14

Bolts, Flush, §55, p11

Foot, §55, p110

Indicator, §55, p123

Shutter, §55, p130

Special, §55, p17

Transom, §55, p93

Brads, §55, p9

Flooring, §55, p9

Brass and bronze butts, §55, p9

and bronze door knobs, §55, p72

Brick, Common, §61, p9

Pressed, §61, p8

Table of labor prices per thousand, §60, p34

Brickwork, §60, p31

Calculating quantities for, §61, p8

Cost of, §60, p32

Cost of common, §61, p10

Cost of pressed, §61, p9

Estimating, §60, p33

Bridging, §61, p14

Bronze and brass door knobs, §55, p72

Builders’ hardware, §55, p1

Building blocks, Cost of concrete, §60, p23

Data on cost of reinforced-concrete, §60, p20

per cubic foot, Table of cost of, §60, p3

per square foot, Cost of framing and covering of, §60, p41

Summary of cost of, §61, p44

Butts and hinges, §55, p24

C

Cabinet hinges, §55, p132

locks, §55, p64, p136

Calculating number of studs, §60, p39

quantities for brickwork, §61, p8

quantities for carpentry work, §61, p10

quantities for excavations, §61, p2

quantities for gas-fitting, Estimating and, §61, p40

quantities for heating and ventilating system, Estimating and,

§61, p35

quantities for joinery, §61, p23

quantities for lathing and plastering, §61, p22

quantities for painting, Estimating and, §61, p42

quantities for plumbing system, Estimating and, §61, p37

quantities for roofing, §61, p21

quantities for stonework, §61, p4

quantities, Scope of subject of estimating and, §60, p1

quantity of nails required, §60, p45

sheathing or rough flooring, §60, p40

the volume of an excavation, §60, p16

Care and maintenance of locks, §55, p69

Carpenter, Work per day of, §60, p42

Carpentry, §60, p38

Cost of, §61, p21

Table of cost of miscellaneous items of, §60, p45

work, Calculating quantities for, §61, p10

Casement adjusters, §55, p99

bolts, §55, p94

Casing nails, §55, p9

Cast-iron door knobs, §55, p71

-iron hinge butts, §55, p27

-iron sash weights, §55, p18

Catches, Cupboard, §55, p133

Elbow, §55, p134

Ceiling, Cost of yellow-pine, §61, p20

Yellow-pine porch, §61, p20

Cellar excavations, §61, p2

floors, Cost of cement, §60, p23

stairs, §61, p30

Cement cellar floors, Cost of, §60, p23

Centers, Sash, §55, p88

Chain bolts, §55, p110

Door, §55, p107

fastener, §55, p107

Chains, Sash, §55, p81

Transom, §55, p93

Chimneys, Construction of brick, §64, p49

Factory, §64, p45

Stability of brick, §64, p47

Table of capacities of, §64, p46

Chipped glass, §55, p158

Classification of factory buildings, §64, p2

Clinch nails, §55, p10

Coal storage in factories, §64, p42

Column footings, §64, p28

Columns, Strength of concrete, §64, p24

Strength of reinforced-concrete, §64, p25

Combination locks, §55, p67

Concrete, Advantages of reinforced, §64, p24

beams and girders, §64, p26

building blocks, Cost of, §60, p23

buildings, Data of cost of reinforced-, §60, p20

columns, Strength of, §64, p24

factory buildings, §64, p23

footings, §64, p14

footings and floor, §61, p7

footings, Cost of, §61, p7

Table of cost of plain gravel, §60, p19

Table of cost of plain stone, §60, p19

walls supporting cranes, §64, p39

window heads, §64, p27

work, Plain, §60, p18

work, Reinforced-, §60, p18

Construction of brick chimneys, §64, p49

Slow-burning, §64, p18

Types of mill, §64, p13

Contractor’s method of figuring excavation, §60, p14

Corner and strap hinge plates, §55, p44

Cornice, spandrels, etc., Cost of, §61, p20

Cornices, Measuring of, §60, p41

Cost of ashlar, §61, p6

of ashlar or cut stone, §60, p26

of ashlar or cut stone, Estimating, §60, p28

of baseboards, rails, and moldings, §60, p67

of brickwork, §60, p32

of building, Summary of, §61, p44

of buildings per cubic foot, Table of, §60, p3

of carpentry, §61, p21

of cement cellar floors, §60, p23

of common brickwork, §61, p10

of concrete building blocks, §60, p23

of concrete footings, §61, p7

of cornice, spandrels, etc., §61, p20

of ditch work, Estimating the, §60, p15

of door frames and doors, §60, p65

of electric wiring, §61, p41

of excavation, §61, p4

of excavation, Actual, §60, p12

of flagstones and curbing, §60, p26

of flooring, §61, p19

of framing, §61, p17

of framing and covering of building per square foot, §60, p41

Cost of gas-fitting, Estimates and, §60, p72

of granite, §60, p29

of gravel roofs, §60, p54

of hardware, §61, p35

of heating and ventilating system, §61, p37

of joinery, §61, p33

of labor for gas-fitting, §61, p41

of labor for installing plumbing system, §61, p40

of lathing, Measurement and, §60, p60

of laying wooden floors, Table of labor and, §60, p44

of mackite, §60, p38

of miscellaneous interior joinery, §61, p32

of miscellaneous items of carpentry, Table of, §60, p45

of molding, §60, p62

of painting, §60, p75; §61, p43

of paneling and wainscoting, §60, p67

of plain gravel concrete, Table of, §60, p19

of plain stone concrete, Table of, §60, p19

of plastering, §60, p59; §61, p23

of plumbing, Approximate, §60, p70

of plumbing system, §61, p40

of pressed brickwork, §61, p9

of reinforced-concrete floor slabs, Table of, §60, p22

of roof tiling per square, Table of approximate, §60, p53

of roofing, §61, p22

of rubble masonry, §60, p25; §61, p5

of sheathing and shingles, §61, p18

of slating per square, §61, p21

of slating per square, Table of approximate, §60, p51

of soft stone, §60, p28

of stairs, §60, p67; §61, p31

of structural steel, §60, p69

of terra-cotta floor arches, §60, p35

of terra-cotta partitions, Table of, §60, p36

of tiling, §60, p37

of verandas, §60, p68

of window frames and windows, §60, p63

of yellow-pine ceiling, §61, p20

Covering, Kinds of roof, §60, p46

of building per square foot, Cost of framing and, §60, p41

Cranes on concrete walls, §64, p39

Planning for traveling, §64, p37

Cranes, Track construction for traveling, §64, p39

Cremorne bolts, §55, p95

Cubic foot, Table of cost of buildings per, §60, p3

Cupboard buttons, §55, p134

catches, §55, p133

latches, §55, p132

Curbing, Cost of flagstones and, §60, p26

Cut nails, §55, p2

nails, Table of sizes of, §55, p6

stone, §61, p6

stone, Cost of ashlar and, §60, p26

D

Designs of hardware, Stock and commercial, §55, p22

Dimension stone, §60, p24

Dimensions of factory chimneys, §64, p45

Ditch work, Estimating the cost of, §60, p15

Door bolts, §55, p108

chains, §55, p107

checks, §55, p111

frames and doors, Cost of, §60, p65

frames, Attic, §61, p24

frames, First-floor, §61, p24

frames, Second-floor, §61, p24

hangers, §55, p114

holders, §55, p105

knobs, §55, p70

knobs, Brass and bronze, §55, p72

knobs, Cast-iron, §55, p71

knobs, Sizes and styles of, §55, p73

knobs, Spun-metal, §55, p73

knobs, Stamped, §55, p72

knobs, Wooden, §55, p71

knockers, §55, p121

Korelock, §60, p66

locks, Interior, §55, p50

pulls, §55, p102

-screen latches, §55, p124

springs, §55, p111

stops, §55, p105

trims for water closets, §55, p123

Doors, Attic, §61, p26

Cost of door frames and, §60, p65

Elevator, in factories, §64, p8

Fireproof, §64, p57

First-floor, §61, p25

Second-floor, §61, p26

Double-acting hinges, §55, p33

-door locks, §55, p57

Dowel-pin, Barbed, §55, p10

Drainage system, §61, p39

Drainage system, Estimates for, §60, p70

Drawer pulls, §55, p135

Drive screws, §55, p13

E

Elbow catches, §55, p134

Electric wiring, Cost of, §61, p41

Elevator doors in factories, §64, p8

Freight, in factories, §64, p8

latches, §55, p124

Location of, in factories, §64, p8

-shaft windows, §64, p10

shafts in factories, §64, p8

Escutcheons, §55, p136

Espagnolette bolts, §55, p96

Estimate, Important factors of, §60, p2

Estimates and cost of gas-fitting, §60, p72

for drainage system, §60, p70

for water-supply system, §60, p71

of well supply of water, §60, p71

on plumbing fixtures, §60, p72

Estimating and calculating quantities for gas-fitting, §61, p40

and calculating quantities for heating and ventilating system,

§61, p35

and calculating quantities for painting, §61, p42

and calculating quantities for plumbing system, §61, p37

and calculating quantities, Scope of subject of, §61, p1

Approximate, §60, p3

brickwork, §60, p6, p33

carpentry, §60, p6

concrete work, §60, p5

cost of ashlar or cut stone, §60, p28

cost of ditch work, §60, p15

Example in, §61, p1

Glazing, §60, p11

Heating and ventilating system, §60, p8

Joinery, §60, p7

of hardware, §55, pl48; §60, p8

of matched flooring, §60, p40

on excavation, §60, p5, p11

on glazing, §60, p78

on papering, §60, p77

Outline of the work of, §60, p4

Painting and papering, §60, p10

Plastering, §60, p7

Plumbing and gas-fitting, §60, p9

Principles of, §60, p3

roofing, §60, p7

schedule, Accurate, §60, p5

schedule, Items of, §60, p5

sheet-metal roofs, §60, p51

Estimating shingles, Table of data for, §60, p48

stone work, §60, p5

stucco work, §60, p58

Estimator, Qualifications of, §60, p2

Excavation, Actual cost of, §60, p12

Calculating the volume of an, §60, p16

Cellar, §61, p2

Contractor’s method of figuring, §60, p14

Estimating on, §60, p11

for wall footings, §61, p3

Excavations, Calculating quantities for, §61, p2

Cost of, §61, p4

Miscellaneous, §61, p3

Expansion bolts, §55, p14

Exterior joinery, Miscellaneous, §61, p32

painting work, §61, p42

F

Factories, Ash disposal in, §64, p42

Automatic sprinklers in, §64, p53

Boiler room in, §64, p41

Boiler-room planning in, §64, p42

Coal storage in, §64, p42

Fire-protection in, §64, p50

Floors above boilers in, §64, p45

Power plant in, §64, p41

Sprinkler tanks in, §64, p50

Sprinkling system in, §64, p50

Factory buildings, Concrete, §64, p23

chimneys, Dimensions of, §64, p45

elevators, Location of, §64, p8

planning, §64, p3

Fence nails, §55, p10

Figured rolled glass, §55, p159

Filing, §61, p4

Finishes, Hardware, §55, p23

Finishing hardware, §55, p20

nails, §55, p8

Fire-doors, §64, p57

-protection in factory and mill buildings, §64, p50

-tower, Location of, §64, p8

-tower stairway, §64, p4

-towers, Number of, §64, p7

Fittings, Pipe and, §61, p41

Fixtures, Estimates on plumbing, §60, p72

Gas, §61, p40

Plumbing, §61, p37

Flagstones and curbing, Cost of, §60, p26

Fireproof windows, §64, p54

Floor arches, Cost of terra-cotta, §60, p35

Concrete footings and, §61, p7

construction, §64, p14

construction, Slow-burning, §64, p18

Floor framing, Attic, §61, p13

framing, Back-porch, §61, p14

framing, First-story, §61, p11

framing, Front-porch, §61, p13

framing, Second-story, §61, p12

glass, §55, p160

hinges, §55, p35

slabs, Table of cost of reinforced-concrete, §60, p22

Flooring, §61, p19

Calculating sheathing or rough, §60, p40

Cost of, §61, p19

Estimating matched, §60, p40

Rift-sawed, yellow-pine-finish, §61, p19

Yellow-pine porch, §61, p19

Floors, Cost of cement cellar, §60, p23

Table of labor cost of laying wooden, §60, p44

Flush bolts, §55, p111

Footings, §64, p14

and floor, Concrete, §61, p7

Cost of concrete, §61, p7

Excavation for wall, §61, p3

for factory columns, §64, p28

Foundation piers in factories, §64, p16

walls in factories, §64, p16

Frames and doors, Cost of door, §60, p65

and windows, Cost of window, §60, p63

Attic door, §61, p24

Attic window, §61, p28

Cellar window, §61, p26

First-floor door, §61, p24

First-floor window, §61, p27

for porch, Screen, §61, p30

Second-floor door, §61, p24

Second-floor window, §61, p27

Framing and covering of building per square foot, Cost of, §60, p41

Attic floor, §61, p13

Back-porch floor, §61, p14

Cost of, §61, p17

First-story floor, §61, p11

Front-porch floor, §61, p13

Main-roof, §61, p14

Porch-roof, §61, p16

Second-story floor, §61, p12

Freight elevators, §64, p9

Front-door locks, §55, p56

Furnace, §61, p35

G

Galvanized nails and spikes, §55, p11

Gas-fitting, Cost of labor for, §61, p41

-fitting, Estimates and cost of, §60, p72

-fitting, Estimating and calculating quantities for, §61, p40

Gas fixtures, §61, p40

Gate latches, §55, p125

Gauge, Screw maker’s, §55, p13

Wire, §55, p4

Girders and beams, Concrete, §64, p26

and beams in mill construction, §64, p34

Glass, §55, p157

Chipped, §55, p158

Figured, §55, p159

Floor, §55, p160

Ground, §55, p157

knobs, §55, p72

per box, Table of panes of window, §60, p69

Plate, §55, p160

Prismatic, §55, p162

Skylight, §55, p160

Wire, §55, p161

Glazier’s point, §55, p165

Glazing, Estimating on, §60, p78

Granite, Cost of, §60, p29

Gravel concrete, Table of cost of plain, §60, p19

roofs, Cost of, §60, p54

Gravity-locking hinge, §55, p39

Ground glass, §55, p157

H

Hardware, §61, p33

Allowance for, §55, p147

Application of, §55, p151

Builders’, §55, p1

Commercial and stock designs of, §55, p22

Cost of, §61, p35

Emblematic, §55, p139

Estimating on, §55, p148

Finished, §55, p23

Finishing, §55, p20

Historic styles of, §55, p23

Metals used in, §55, p22

Miscellaneous, §61, p34

Proprietary, §55, p138

schedules, §55, p154

Selection of, §55, p146

specifications, §55, p142

Staple, §55, p1

Window-sash, §55, p77

Hardwood, Staining, §60, p76

Heating and ventilating system, Estimating of, §60, p69

and ventilating system, Estimating and calculating

quantities for, §61, p35

High-grade locks, §55, p49

Hinge butts, §55, p26

butts, Cast-iron, §55, p27

Hinge butts, Sizes of, §55, p30

butts, Steel, §55, p28

Gravity-locking, §55, p39

plates, Strap and corner, §55, p44

Hinges, §61, p34

and butts, §55, p24

Brass and bronze, §55, p29

Cabinet, §55, p132

Double-acting, §55, p33

Floor, §55, p35

Invisible, §55, p41

Shutter and blind, §55, p38

Single-acting, §55, p31

Strap, §55, p24

History of metals, §55, p20

Hotel and office locks, §55, p58

key tags, §55, p76

I

Implied contract, §61, p4

Indicator bolts, §55, p123

Interior door locks, §55, p50

joinery, Cost of miscellaneous, §61, p32

joinery, Miscellaneous, §61, p31

painting work, §61, p42

Invisible hinges, §55, p41

J

Joinery, Baseboard and beam casings, §60, p61

Blinds, §60, p61

Calculating quantities for, §61, p23

Cost of, §61, p33

Cost of miscellaneous interior, §61, p32

Doors, §60, p61

Frames, §60, p61

Inside fixtures, §60, p62

Miscellaneous interior, §61, p31

Porches, §60, p62

Sash, §60, p61

Stairways, §60, p62

Wainscoting, §60, p61

K

Key tags, §55, p76

Kick plates, §55, p102

Knobs, Glass, §55, p72

Knockers, Door, §55, p121

Korelock door, §60, p66

L

Label plates, §55, p138

Labor cost of laying wooden floors, Table of, §60, p44

for gas-fitting, Cost of, §61, p41

for installing plumbing system, Cost of, §61, p40

Labor prices per thousand brick, Table of, §60, p34

Latches, Cupboard, §55, p132

Elevator, §55, p124

Gate, §55, p125

Screen-door, §55, p124

Lath nails, §55, p9

Lathing and plastering, Calculating quantities for, §61, p22

Measurement and cost of, §60, p60

Laying wooden floors, Table of labor cost of, §60, p44

Lead sash weights, §55, p18

Locks, §55, p44; §61, p34

Bank and safe, §55, p66

Cabinet, §55, p64, p136

Care and maintenance of, §55, p69

Combination, §55, p67

Double-door, §55, p57

for residence, §55, p56

Front-door, §55, p56

High-grade, §55, p49

Interior door, §55, p5O

Master-key, §55, p51

Mortise, §55, p45

Office and hotel, §55, p58

Prison and asylum, §55, p64

Lumber, Prices of, §60, p39

M

Mackite, Cost of, §60, p38

Manipulation of metals, §55, p20

Masonry, Cost of rubble, §60, p25; §61, p5

Rubble, §61, p4

Stone, §60, p24

Master-key locks, §55, p51

-key lock, Yale, §55, p52

Measure, Board, §60, p38

Measurement and cost of lathing, §60, p60

of painting, §60, p72

of plastering, §60, p58

Measuring cornices, §60, p41

for slating, §60, p49

shingle roofing, §60, p46

weather boarding or siding, §60, p41

Mensuration, Roof, §60, p54

Metals, History of, §55, p20

Manipulation of, §55, p20

used in hardware, §55, p22

Mill buildings, Fire-protection in, §64, p50

buildings, Steel-frame, §64, p31

construction, Beams and girders in, §64, p34

construction, Types of, §64, p13

design, §64, p1

Molding, Cost of, §60, p62

Moldings, Cost of baseboards, rails, and, §60, p67

Mortise locks, §55, p45

N

Nail sizes, Table of, §55, p6

Nails, §55, p2

and spikes, Galvanized, §55, p11

and studs, Ornamental, §55, p125

Barb, §55, p9

Casing, §55, p9

Clinch, §55, p10

Fence, §55, p10

Finishing, §55, p8

Lath, §55, p9

required, Calculating the quantity of, §60, p45

required for various purposes, Table of quantity of, §60, p46

Roofing, §55, p9

Shingle, §55, p9

Size of, §55, p3

Slating, §55, p9

used in tin roofing, §55, p45

O

Office and hotel locks, §55, p58

Ornamental nails and studs, §55, p125

P

Padlocks, §55, p61

Paint required, Quantities of, §60, p73

Painting, Care in, §60, p74

Cost of, §60, p75; §61, p43

Estimating and calculating quantities for, §61, p42

materials, Table of quantities of, §60, p74

Measurement of, §60, p72

work, Exterior, §61, p42

work, Interior, §61, p42

Paneling and wainscoting, Cost of, §60, p67

Paper, Estimating on, §60, p77

Partition studding, §61, p17

Pipe and fittings, §61, p41

Pipes, Warm-air and smoke, §61, p35

Planning factories, §64, p3

for traveling cranes, §64, p37

Plastering, Calculating quantities for lathing and, §61, p22

Cost of, §60, p59; §61, p23

Measurement of, §60, p58

Three-coat, §61, p22

Two-coat, §61, p22

Plate glass, §55, p160

Plates, Kick, §55, p102

Plates, Push, §55, p104

Sign, §55, p105

Plumbing, Approximate cost of, §60, p70

fixtures, §61, p37

fixtures, Estimates on, §60, p72

system, Cost of, §61, p40

system, Cost of labor for installing, §61, p40

system, Estimating and calculating quantities for, §61, p37

Porch ceiling, Yellow-pine, §61, p20

Screen frames for, §61, p30

Post caps, §64, p13

Power plant in factories, §64, p41

Prices of lumber, §60, p39

per thousand brick, Table of, §60, p34

Prismatic glass, §55, p162

Prison and asylum locks, §55, p64

Proprietary hardware, §55, p138

Pulley, Sash, §55, p77

Push plates, §55, p104

Putty, §55, p165

Q

Quantities for brickwork, Calculating, §61, p8

for carpentry work, Calculating, §61, p10

for excavations, Calculating, §61, p2

for gas-fitting, Estimating and calculating, §61, p40

for heating and ventilating system, Estimating and calculating,

§61, p35

for joinery, Calculating, §61, p23

for lathing and plastering, Calculating, §61, p22

for painting, Estimating and calculating, §61, p42

for plumbing system, Estimating and calculating, §61, p37

for roofing, Calculating, §61, p21

for stonework, Calculating, §61, p4

of building materials put in place per day by one man,

Table of, §60, p43

of paint required, §60, p73

of painting material, Table of, §60, p74

Scope of subject of estimating and calculating, §60, p1

Quantity of nails for various purposes, Table of, §60, p46

of nails required, Calculating, §60, p45

R

Rails, and moldings, Cost of baseboards, §60, p67

Register boxes, Tin, §61, p36

Registers, §61, p36

Reinforced concrete, Advantages of, §64, p24

-concrete buildings, Data on cost of, §60, p20

-concrete columns, Strength of, §64, p25

-concrete floor slabs, Table of cost of, §60, p22

-concrete work, §60, p18

Residences, Locks for, §55, p56

Reversible locks, §55, p125

Roof construction, Slow-burning, §64, p18

covering, Kinds of, §60, p46

framing, Main, §61, p14

framing, Porch, §61, p16

mensuration, §60, p54

tiling per square, Table of approximate cost of, §60, p53

Roofing, Calculating quantities for, §61, p21

Cost of, §61, p22

items, Miscellaneous, §61, p21

materials for steel-frame mills, §64, p31

Measuring of shingle, §60, p46

nails, §55, p9

Roofs, Cost of gravel, §60, p54

Estimating sheet-metal, §60, p51

Tile, §60, p53

Rubble, §60, p24

masonry, §61, p4

masonry, Cost of, §60, p25; §61, p5

S

Safe and bank locks, §55, p66

-deposit locks, §55, p63

Sash, Attic window, §61, p29

balances, §55, p82

Cellar window, §61, p28

centers, §55, p88

chains, §55, p81

cord, Table of, §55, p81

cords, §55, p81

fasts, §55, p83

First-floor window, §61, p28

lifts, §55, p85

locks, §55, p83

-operating devices, §55, p100

pole hooks, §55, p86

pulley, §55, p77

Second-floor window, §61, p29

sockets, §55, p86

stop-screws, §55, p87

weights, §55, p18

weights, Sectional, §55, p19

Sawed shingles, §60, p48

Schedule, Accurate estimating, §60, p5

Screen frames for porch, §61, p30

-door latches, §55, p124

Screw anchors, §55, p16

makers’ gauge, §55, p13

sizes, Table of, §55, p13

Screws and bolts, §55, p11

Drive, §55, p13

Sash stop-, §55, p87

Wood, §55, p11

Sectional sash weights, §55, p19

Selection of hardware, §55, p146

Shafts, Elevator, in factories, §64, p8

Shaved shingles, §60, p47

Sheathing, §61, p18

and shingles, Cost of, §61, p18

or rough flooring, Calculating of, §60, p40

Sheet-metal roofs, Estimating of, §60, p51

Shingle nails, §55, p9

roofing, Measuring, §60, p46

Shingles, §61, p18

Classification of, §60, p47

Cost of sheathing and, §61, p18

Sawed, §60, p48

Shaved, §60, p47

Table of data for estimating, §60, p48

Shutter and blind hinges, §55, p38

bolts, §55, p130

fasteners, §55, p129

Siding, Measuring weather boarding or, §60, p41

Sign plates, §55, p105

Single-acting hinges, §55, p31

Sizes of hinge butts, §55, p30

of wire nails, §55, p7

Skylight glass, §55, p160

Slates per square, Table of number of, §60, p50

Slating, §61, p21

Measuring for, §60, p49

nails, §55, p9

per square, Table of approximate cost of, §60, p51

Sliding-door hangers, §55, p114

Slow-burning construction, §64, p18

-burning floor construction, §64, p18

-burning roof construction, §64, p25

Smoke pipes, Warm-air and, §61, p35

Socket, Sash, §55, p86

Soft stone, Cost of, §60, p28

Spandrels, etc., Cost of cornice, §61, p20

Special bolts, §55, p17

wire nails, §55, p8

Spikes and nails, Galvanized, §55, p11

Splice pieces in mill construction, §64, p15

Sprinkler system in factories, §64, p50

tanks, §64, p50

Spun-metal door knobs, §55, p72

Stability of brick chimneys, §64, p47

Stair towers in factories, §64, p4

Stairway in fire tower, §64, p6

Stairs, Back, §61, p30

Cellar, §61, p30

Cost of, §60, p67

Main, §61, p30

Stamped door knobs, §55, p72

Standard wire gauge, §55, p4

Staple hardware, §55, p1

Steel-frame mill building, §64, p31

-frame mills, Roofing material for, §64, p31

hinge butts, §55, p28

Stock and commercial designs of hardware, §55, p22

Stone concrete, Table of cost of plain, §60, p19

Cost of ashlar and cut, §60, p26

Cost of soft, §60, p28

Cut, §61, p6

Dimension, §60, p24

Estimating the cost of ashlar or cut, §60, p28

masonry, §60, p24

Stonework, Calculating quantities for, §61, p4

Store-door locks, §55, p61

Strap and corner hinge plates, §55, p44

hinges, §55, p24

Strength of concrete columns, §64, p24

of reinforced-concrete columns, §64, p25

Structural steel, Cost of, §60, p69

Stucco work, Estimating, §60, p58

Studding, Partition, §61, p17

Wall, §61, p16

Studs and nails, Ornamental, §55, p125

Calculating number of, §60, p39

Styles and sizes of door knobs, §55, p73

Subtreasury locks, §55, p69

T

=T= hinges, §55, p25

Table of approximate cost of roof tiling per square, §60, p53

of approximate cost of slating per square, §60, p51

of cost of building per cubic foot, §60, p3

of cost of miscellaneous items of carpentry, §60, p45

Table of cost of plain gravel concrete, §60, p19

of cost of plain stone concrete, §60, p19

of cost of reinforced-concrete floor slabs, §60, p22

of cost of terra-cotta partitions, §60, p36

of cut-nail sizes, §55, p6

of data for estimating shingles, §60, p48

of height of chimneys, §64, p46

of labor cost of laying wooden floors, §60, p44

of labor prices per thousand brick, §60, p34

of number of slates per square, §60, p50

of panes of window glass per box, §60, p69

of quantities of material put in place per day by one man, §60, p43

of quantities of painting materials, §60, p74

of quantity of nails required for various purposes, §60, p46

of sash cord, §55, p81

of sash weights, §55, p19

of standard wire gauge, §55, p4

of wood screw sizes, §55, p13

Terra-cotta floor arches, Cost of, §60, p35

-cotta partitions, Table of cost of, §60, p36

-cotta window heads in factories, §64, p16

Tiling, Cost of, §60, p37

per square, Table of approximate cost of roof, §60, p53

Time locks, §55, p67

Toggle bolt, §55, p17

Toilet-room fixtures, §64, p12

-room partitions, §64, p11

rooms, Location of, §64, p10

Track construction for traveling cranes, §64, p39

Transom bolts, §55, p93

catches, §55, p93

chains, §55, p93

lifts, §55, p91

Traveling cranes, Planning for, §64, p37

cranes, Track construction for, §64, p39

Turnbuckles, §55, p131

Types of mill construction, §64, p13

U

Underflooring, Hemlock, §61, p19

Unit-cylinder locks, §55, p49

V

Vault lights, §55, p163

Ventilating system,

Estimating and calculating quantities for heating and, §61, p35

system, Estimating heating and, §60, p69

Verandas, Cost of, §60, p68

Volume of an excavation, Calculating the, §60, p16

W

Wainscoting, Cost of paneling and, §60, p67

Wall footings, Excavation for, §61, p3

foundations for factories, §64, p16

studding, §61, p16

Warm-air and smoke pipes, §61, p35

Water-closet door trims, §55, p123

Estimates for well supply of, §60, p71

supply, §61, p38

-supply system, Estimates for, §60, p71

Waterproofing, §64, p15

Weather boarding or siding, Measuring of, §60, p41

Well supply of water, Estimates for, §60, p71

Window, Elevator shaft, §64, p10

Fireproof, §64, p54

frames and windows, Cost of, §60, p63

frames, Attic, §61, p28

frames, Cellar, §61, p26

Window frames, First-floor, §61, p27

frames, Second-floor, §61, p27

glass per box, Table of number of panes of, §60, p69

heads, Concrete, §64, p27

heads in slow-burning construction, §64, p22

heads, Terra-cotta, in factories, §64, p16

openings in factories, §64, p17

sash, Attic, §61, p29

sash, Cellar, §61, p28

sash, First-floor, §61, p28

-sash hardware, §55, p77

sash, Second-floor, §61, p29

Windows, Cost of window frames and, §60, p63

Wire brads, §55, p9

gauge, §55, p4

glass, §55, p161; §64, p54

nails, §55, p2

nails, Special, §55, p8

nails, Table of sizes of, §55, p7

Wiring, Cost of electric, §61, p41

Wood screws, §55, p11

screws, Table of sizes of, §55, p13

Wooden door knobs, §55, p71

floors, Table of labor cost of laying, §60, p44

Y

Yale master-key lock, §55, p52

Hardware, estimating, and mill design · 第 194 / 194 题