STANDARD SLOW-BURNING CONSTRUCTION

=30.= A type of factory construction more usual than that previously

described is illustrated in Fig. 12. In this illustration, it will be

noticed that the main girders bear on wall pilasters, and the spandrel

filling between the pilasters is kept as thin as possible. The usual

reveal window frame is used, as shown at _a_, and the soffit of the

arch over the window openings is checked at the head of the opening to

provide a wind and water stop as at _b_. In this construction, which

is probably the best, though it does not possess the advantage of

giving the maximum amount of window space, and, consequently, light in

the building, a rowlock or bonded brick arch is used over the window

frames. By means of this construction, either the window frame may be

built in place, or the windows may be slipped in from the back against

a rabbet formed in the brickwork. The arch over the window head is

indicated at _c_.

[Illustration: FIG. 12]

[Illustration: FIG. 13]

=31. Floor Construction.=—The floor construction consists of

heavy timber girders, no dimension of which may be less than 6

inches, as otherwise it would not comply with the requirements of

slow-burning construction. The floor planking consists of 3- or 4-inch

tongued-and-grooved spruce, or yellow-pine planking, planed on the

under side, and thoroughly spiked to the girder. Planking of the

former thickness may be used for clear spans as great as 8 feet, while

the latter thickness may be used for up to 10-foot or even 12-foot

spans, if the loads are light. The girders are indicated at _d_, and

the floor planking at _e_. Usually the girders, in order to obtain the

requisite strength, are made of long-leaf yellow pine. On the top of

the spruce planking is placed a finished maple floor. This floor is

made from either 1-inch maple, which finishes as ⅞ inch, or 1¼-inch

maple, which finishes as 1⅛ inches, in thickness. Neponsett sheathing

paper, or deadening felt, is placed between the spruce planking and

the finished maple flooring for the purpose of preventing dust from

percolating through. This sheathing paper or felt is sometimes made

waterproof to prevent leakage due to water used for fire-extinguishing

purposes.

Frequently, the brickwork is corbeled out, as indicated at _f_, in

order to form a fire-stop between floors, or at least to prevent an

open joint at this place. Where the walls are offsetted, as shown in

Fig. 13, there is no need of corbeling out, for the offset in the

brickwork can be made to form the fire or dust stop.

=32.= Where heavy yellow-pine girders bear on brick walls, it is

usual to obtain the requisite bearing area by the use of cast-iron

bearing plates, as indicated in Fig. 14 (_a_), (_b_), and (_c_). In

(_a_) is shown an ordinary flat plate that has an area figured so that

the load on the brickwork will not exceed its ultimate stress, which

for brickwork laid in lime-and-cement mortar is about 150 pounds per

square inch, while for brickwork laid in cement mortar, it is in the

neighborhood of 200 pounds per square inch. This plate is usually cast

with a lug on the back, as at _a_, to be built in the brickwork, and

dowel-pins, or a lip, as at _b_, over which the girder is fitted,

or notched. By this means, a tie to the wall is obtained. There is

difficulty, however, in using such a connection, for the carpenters on

the job frequently miscut their beams, so that the notchings or borings

at _b_ do not come where they should, and to remedy the defect, the

notchings, or borings, are cut or gouged out, so that frequently the

pin or lip at _b_ is not brought to bear against the timber.