TABLE VIII

COST OF MISCELLANEOUS ITEMS OF CARPENTRY

===================================+=======+=======================

Class of Work | Cost | Remarks

-----------------------------------+-------+-----------------------

Setting window frames in |$ .45 |Each.

wooden buildings | |

| |Per square foot;

Furring brick walls, 1" × 2" | .02½ | includes labor,

strips, 12-inch centers | | material, and nails.

| |

Furring brick walls, 1" × 2" | .01⅞ |Per square foot.

strips, 16-inch centers | |

| |

Cutting holes and fitting | .05 |Each.

plugs in brick walls | |

| |

Setting window frames in brickwork| .60 |Each; includes nails

| | and bracing.

| |

Setting door frames in brickwork | .60 |Each.

| |

Setting window frames in stonework | 1.25 |Each, for ordinary work.

| |

Setting window frames in stonework | 2.00 |Each, for very careful

| | work.

| |

Setting door frames in stonework | 2.00 |Each, for very careful

| | work.

| |

Furnishing and setting trimmer-arch| 2.00 |Each

centers | |

| |

Arch centers, 4-foot span, | 1.50 |Each; includes supports

8-inch reveal | | and wedges.

===================================+=======+=======================

=54. Nails.=—To calculate the quantity of nails required in executing

any portion of the work, Table IX, which is based on the use of cut

nails, will be found useful.