DATA ON BRICKWORK

=35.= The following estimates on the cost of brickwork are very

carefully compiled, and will be found trustworthy. It should be

understood that the prices will vary with the cost of materials and

labor; the proportions, however, will be constant. The figures are

based on _kiln_, or actual, count; that is, with deductions for

openings. When the work is measured with no deductions for openings,

the cost per thousand may be assumed as about 15 per cent. less than

the prices given, which are exclusive of scaffolding, hoisting, and

builder’s profit. The scaffolding will cost, according to conditions of

the structure and site, from 5 to 7 per cent. of the prices given.

Hardware, estimating, and mill design · 第 99 / 194 题