OUTLINE OF THE WORK

=5.= The drawings and specifications of a structure are the guides that

the estimator must follow in making his computations. All measurements

necessary for calculating the quantity of the materials required are

obtained from the drawings; and all information in regard to the

character of the workmanship and the quality of the materials to be

used is furnished by the specifications.

In compiling a schedule, there are three stages to the operation: (1)

Taking the dimensions for each of the various classes of work; (2)

computing and collecting the quantities; and (3) estimating the cost.

In carrying out the first of these steps, each of its subdivisions

should be considered in the order in which the work will be executed in

the building. This order is about as follows:

1. Excavation 8. Joinery

2. Concrete work 9. Hardware and ironwork

3. Stonework 10. Heating and ventilation

4. Brickwork 11. Plumbing and gas-fitting

5. Carpentry 12. Painting and papering

6. Roofing 13. Glazing

7. Plastering

The third step, estimating the cost, may be subdivided into cost of

labor and cost of material. The latter can be definitely fixed by an

examination of lists giving current prices of materials; while the

former must be based on a fixed rate of wages per day for the various

classes of workmen.

The second and third branches of the work, being closely connected with

the first, will be partly considered in connection with it, and, later,

in detail in the complete example on estimating.