APPROXIMATE ESTIMATING

=4.= In order to make a preliminary estimate, before the plans of a

structure are drawn, but after the general dimensions of the proposed

building have been determined, architects and builders sometimes

employ a method of =approximate estimating=, by which the cost is

figured at so much per cubic foot of the building, the rate varying

according to its character and the finish required. The method is

also considerably used by insurance companies in fixing the amount to

be placed on a building. It should be borne in mind that this method

gives the approximate cost only, and should never be used in figuring

the contract price of a building. This estimate, however, may be used

to advantage in checking the accurate estimate, with which it will

frequently be found to agree remarkably well.