FORM I

(SEE GENERAL CONDITIONS)

=NOTE.=—Under the head of _General Conditions_ preceding all

specifications furnished to contractors by the architect, a series of

binding requirements, reservations, and stipulations are specifically

stated, and it is most essential that the contractor carefully peruse

them, as he is bound by them as well as by the clauses under the

heading of Hardware Specifications.

=122. Rough Hardware.=—Provide all the rough hardware, such as nails,

screws, sash weights, pulleys, chain or cord, anchors, screw bolts, and

all other material in this line necessary for the completion of the

operation.

=123. Finishing, or Builders’, Hardware.=—All fastenings and metal

trimmings used on doors, windows, transoms, closets, cabinets,

pantries, etc. will be furnished by the owner and delivered at the

building in the quantities and at the times reasonably needed by

the contractor, he to apply the same under the direction and to the

satisfaction of the architect.

The contractor is to be responsible for all hardware after delivery and

until the completion of the building. He shall hang all doors, properly

fit all locks, etc., and return them to their original packages until

after completion of the painting or finishing, when he shall place them

permanently. All knobs shall be covered with Canton flannel, to protect

them from injury, and all keys are to be cared for until the building

is delivered to the owner. The contractor shall place all keys in their

locks or deliver them to the architect with tags attached, indicating

where they belong.

The contractor shall furnish the manufacturer or dealer furnishing the

hardware with details of woodwork or information that may be necessary

in order to understand the requirements and to harmonize the hardware

with the cabinetwork, and, where interferences are discovered, to have

them adjusted before the hardware is delivered.