RAILWAY UP VESUVIUS.

This railway, the last new project in mountain-climbing, is now finished.

It is 900 metres in length, and will enable tourists to ascend by it to

the very edge of the crater. The line has been constructed with great

care upon a solid pavement, and it is believed to be perfectly secure

from all incursions of lava. The mode of traction is by two steel ropes

put in motion by a steam engine at the foot of the cone. The wheels of

the carriages are so made as to be free from any danger of leaving the

rails, besides which each carriage is furnished with an exceedingly

powerful automatic brake, which, should the rope by any chance break,

will stop the train almost instantaneously. One of the chief

difficulties of the undertaking was the water supply; but that has been

obviated by the formation of two very large reservoirs, one at the

station, the other near the observatory.

—_Railway Times_, 1879.

Railway Adventures and Anecdotes: Extending over More Than Fifty Years · 第 290 / 313 题