PAYMENTS.

Payments shall be made as follows: Upon completion of the preliminary

sketches, 1 per cent of estimated cost; upon completion of the general

drawings and specifications, an additional 1-1/2 per cent of estimated

cost; upon completion of details an additional 1 per cent of estimated

cost; and upon completion of the work, the charge for supervision or

inspection. At that time, also, any differences between the percentage

upon the estimated and actual cost is to be settled, and any deficiency

is to be paid or excess credited.

Travelling expenses and other necessary disbursements are payable when

incurred.

In case contracts are not entered into for the work within six months

after the drawings are ready for contractors to estimate, payment shall

be made for the work done at the rates herein before specified, computed

upon the estimated cost. Provided, however, that if at any subsequent

time the plans and specifications prepared by us, are used and the

actual cost exceeds the estimated cost, compensation upon such excesses,

shall be made at the rates aforesaid.