POINTS FOR ERECTING AND OPERATING HAND PUMPS.

_Foundation_—For the smaller sizes a foundation is not necessary,

other than a good floor. With the large sizes it is advisable to have

a substantial foundation. Concrete, well rammed into place, surmounted

by a capstone, is as good as any. The foundation allows the pump to be

run at a higher speed; a plan showing location of bolt-holes, position

of flanges, and general dimensions, so that there may be no delay in

setting the pump upon arrival at its destination.

[Illustration: FIG. 180.]

_Suction Pipe_—The suction pipe should be as short and direct as

possible, avoiding all turns not necessary. Place a strainer and

foot-valve, Fig. 180, on the suction pipe. It is better for the pump to

have a slight suction except when hot water is pumped, than to supply

the water to the pump under a slight head.

_Discharge Pipe_—Make the discharge piping as straight as possible,

using long bends.

_Packing_—The stuffing boxes should be carefully packed and the gland

brought up firmly against the packing; screwing up the gland by hand

should be sufficient.

Large sizes of suction and discharge pipe are desirable, because the

friction of the water in the pipes thus reduced makes the pump work

easier.

Pumps and Hydraulics, Part 1 (of 2) · 第 116 / 357 题