THE PERGOLA

Among the many structures used to beautify the grounds of a suburban

or country place, the pergola is seen less than it should be. It is

a luxury, but so is a couch hammock, and many other details of our

modern life might be placed under the same heading. As an arbour for

the training of the vines, the pergola adds more dignity to a place

than any other structure, always assuming that it is well built and

in good proportion. Its length must of course depend on the local

circumstances. It should lead somewhere, as from the house to the

flower garden, or from house to stable. It should, in other words, not

be placed on the grounds simply as an ornament. Its purpose should be

to give a certain amount of privacy to a walk.

The oldest recognized style of architecture is known as post and beam

construction, as suggested in Fig. 219, where two vertical members

support a horizontal one. This style was used by the Egyptians and

Greeks, and was a large factor in deciding the form of the old Greek

temples. The pergola consists of two parallel rows of columns connected

by longitudinal beams and cross beams.

A very artistic one may be built by two boys with the assistance of a

third person in the heavy work of lifting and placing the columns. If a

small-sized structure with 6-inch columns is built, two boys can handle

the whole construction alone.

This small size is not recommended, however, as one of the first

requisites of the pergola is a massive appearance of solidity and

permanence.

The proportions for two sizes are given in the drawing, and they may be

modified to suit the size of the ground, buildings, etc. (Fig. 220.)

Wooden columns in many styles, sizes, and proportions are on the market

and may be bought from any lumber dealer. The bases and caps are

separate and should be ordered to fit the columns.

The construction of the pergola brings the young carpenter in contact

with several new problems. The first is the subject of foundations.

These may be in the form of concrete, which is permanent and solid, and

will not decay, as any form of wooden post will do in time. The ground

should be as nearly level as possible, and should be staked out with

eight stakes, as shown in the drawing. (Fig. 221.)

[Illustration: Fig. 219. The Pergola]

The stakes are three feet from the centre of the columns in each case,

and angle _a c d_ should be made square at the beginning. Measure

distance _a b_ equal to _c d_. From _a_ measure along a line stretched

from _a_ to _b_ three feet, and then three spaces of twelve feet each.

Measure the same distance from _c_ along _c d_, and place stakes at

each point. A line stretched from _e_ to _f_ should pass over the

centre of the stakes marking the centre of each column, as these latter

stakes will be dug out in the process of excavating for the foundation,

while stakes _e_ and _f_ are necessary for the proper location of the

holes.

After digging the first two holes, test their accuracy by again

stretching a cord or masons' line from _e_ to _f_. Proceed with the

next set of holes in the same way, placing new stakes three feet out

from centres to correspond with _e_ and _f_. When the eight holes have

been dug, the arrangement will appear as shown at _g_, twelve stakes

being left in the ground. Should the pergola be longer or narrower, the

same method would be used, the dimensions only being altered. The size

of the holes will depend on the following considerations:

[Illustration: Fig. 220. The pergola]

Assuming that we are building the large pergola with eight-inch

columns, the base will be about twelve inches square. Measure the

base and add two inches to it, making, say, a fourteen-inch square,

the size of the foundation. A box in the form shown at _a_, 14 inches

square inside, must be made. No nails are used on the box. It is held

together by cleats _c c_. They must be made to fit snugly, and are to

be knocked off when the cement has hardened--_i. e._, about four days

after making.

These boxes may be full depth of the hole, three feet, or, as is

sometimes done, the hole is made just the right size and the box, about

eighteen inches in length, wedged into the top as shown at _i_. This

method calls for considerable care in levelling the top of the box and

securing the proper projection above ground, as well as in pouring in

the cement without dislodging it, but the box is removed more easily

than is the case with a full-length one. The decision about this point

determines the size of the hole. In case the short box is used, the

hole must be fifteen inches square and just enough shaved from the

sides at top to receive the box.

If the full length box is used, the hole should be about twenty inches

square, to allow the cleats to be knocked off and boards withdrawn.

[Illustration: Fig. 221. Details of pergola construction]

This weighty question having been decided, prepare to mix concrete.

Make a mixing board about five or six feet square of flooring boards

fastened to heavy cleats on the under side. It should have two or three

sides nailed on, as shown at _k_. Also prepare eight wooden blocks, as

shown in drawing. These may be fifteen to eighteen inches long, sawed

from 4 × 4 timber, planed smooth and with a slight taper toward the

lower end. The purpose of these blocks will be apparent later on. The

concrete is composed of four parts clean gravel to one of Portland

cement, and the best is always the cheapest in the long run. Use a pail

for mixing and place four pailfuls of gravel on the mixing board. Pour

over this one pailful of dry cement and mix thoroughly, turning the

whole mass several times. When thoroughly mixed, pour on water, half

a pailful at a time, and turn again with the shovel until the whole

mass is wet. Shovel this into the first box. It will probably take two

such mixings to fill it. Now place in the top of the concrete one of

the tapering blocks, allowing it to project about three or four inches

above the surface of the concrete. The block should be rubbed with

grease or oil before insertion to make it withdraw easily. As soon as

the block is placed, pass the line from stakes _e_ to _f_ and make sure

that the block is exactly at the centre.

In every case it is to be withdrawn in about an hour, or as soon as

the concrete has set, but before it has gripped the block too tightly;

otherwise withdrawal will be a difficult matter. The object of this

performance is to leave in the centre of the foundation a hole about

a foot deep and four inches across. Level the top of concrete with a

trowel and test with the level.

All the foundations are made alike and no effort should be spared to

see that the boxes are level and in line with each other. Test from end

stakes _a b c d_ and from across stakes with the masons' line. This

work will be easier if the four end foundations are made first.

To do the work thoroughly, two boys may count on the process, from the

staking out to the finishing of foundations, occupying about three

days. It is the most important and laborious part of the work and when

finished represents about one third of the labour on the pergola.

The concrete should stand at least four days before it is touched

again, and during that time the timber may be prepared. Besides the

eight columns, there will be needed:

6 pcs. 4 × 6 ins.--16 ft. long

15 pcs. 3 × 6 ins.--14 ft. long

144 ft. (running) 1 × 2 ins.

8 pcs. of 5/8-in. round iron

The iron should be 18 inches longer than the total height of the wooden

columns, including base and cap. This should be determined by actual

measurement. The rods can be obtained from a blacksmith. Have him cut

a thread at each end and provide two nuts for each rod. They are to

extend clear through each column from the bottom of the hole in the

foundation, through the longitudinal timbers that rest on the cap, to

bolt the whole structure together securely.

Columns come either built up or solid. The solid ones have a core bored

out through the centre, so that in either case the rod can easily pass

through from top to bottom. A hole should be bored 3/4 inch diameter

through the centre of both cap and base to allow the bolt to pass

easily.

In ordering timbers, have them dressed on all sides at the mill. Have

the fifteen 3 × 6 inch pieces sawed on both ends as shown at _l_, and

have one end on four of the 4 × 6 inch pieces sawed the same shape. The

two remaining 4 × 6 inch pieces are to be square on the ends.

A week after making the concrete foundations, the boxes having been

removed and the holes filled in with earth well tamped down, the

openings in the top may be cut out with a long cold chisel, as

shown at _m_. This need not be a very particular job. The object is

to dovetail the cement, to be used in filling up the opening to the

foundation, and it can be done roughly. The setting of the columns on

their foundations is performed as follows:

Nail base and cap to each column and slip a long bolt clear through.

At the bottom the bolt will be allowed to project. At the top pass it

through a piece of wood 6 inches high, a 3/4-inch hole being bored for

the purpose.

Fill the opening in the foundation with clear cement mixed with enough

water to bring it to the consistency of paint. Set the column on its

foundation, with the end of the bolt and its nut and a large washer

immersed in the cement. This will harden quickly, making a strong bond

with the foundation and holding the bolt rigid. Plumb the column, and

if it shows a tendency to lean, place thin wedges under it until it

stands true when tested by the plumb and level on all sides.

Treat all the posts alike and when one row has been set, run the

masons' line along the bolts on top and see that they are in line.

Everything should be ready before starting this job, as clear cement

hardens quickly and any moving of the columns that may be necessary in

lining them up must be done before it sets. A good method is to place

the end posts first, tie the masons' line to the bolts and line the

other two posts as they are set.

When they are all on their foundations at last you will begin to

realize for the first time the value and beauty of the task you have

undertaken. Our boys were so excited that every member of the family,

and some of the neighbours, were dragged out as spectators. It did not

seem possible that two boys could handle such a large proposition, but

there it stood as if it were intended to stand for a century. Harry was

for putting on the superstructure at once, but Ralph had to warn him

not to touch it until the cement had thoroughly hardened.

They allowed it to stand two days before they removed the 6-inch blocks

from the bolts at the top and began the work of placing the long 4 ×

6 inch timbers. These members were lapped as shown in the drawing,

3/4-inch holes being bored to receive the bolts.

When all the timbers on one side were in place, the nuts were screwed

down snug on each bolt with a monkey wrench. The work, with the

cutting, fitting, and boring, consumed a whole day, and a second day

was used up on the second row. It was not necessary to call the family

out again. The boys had all the help that could be desired in lifting,

and were also blessed with a continuous audience.

The cross timbers were gained out to a depth of 1-1/2 inches, and

fitted over the long 4 × 6 inch pieces, as shown at _n_. There was one

over the centre of each column, and an additional piece was removed

to provide for the nut, which was thereby entirely concealed. The

remaining cross pieces were spaced three feet apart on centres, and all

spiked securely to the 4 × 6's. It was found advisable to bore 1/4-inch

holes for the spikes, and to sink their heads below the surface with a

nail set.

It only remained to nail on to the cross pieces five rows of 1 × 2 in

the position shown.

All nail holes and cracks were puttied, and the entire structure down

to the cement foundation was given three coats of white paint. Built

in this manner, the pergola will stand for many years, and already the

boys have planted wistaria, honeysuckles, crimson rambler, trumpet, and

other vines to cover it.

The columns themselves may be easily made of concrete. The form may

be made of six or eight inch iron pipe. When this is bought, have it

split in half lengthwise at a machine shop. Six-inch pipe cut in this

way will cost about a dollar a foot, but it will last a lifetime if

protected from rust, and very often the concrete posts may be sold, so

that the form will soon pay for itself.

Have a blacksmith make two iron bands, as shown at _o_. Have a

5/16-inch hole drilled at _a_ through both ends. These bands are used

to hold the two halves of the iron form together, and are tightened by

a bolt and nut at _a_.

Dig a pit for the form to stand in, so that the cement may be easily

poured in. This pit may be about three feet deep by two feet square,

and the sides supported by a box without a bottom.

To make a column, clamp the two bands about the form, and place in

the bottom end a circular piece of wood, with a hole in the centre to

insure the iron rod being in the middle. Place the form upright in the

pit, and secure it firmly by nailing strips of wood across the top

of the box. Place the iron rod in the centre, passing it through the

hole in the bottom. Pour in the cement quite wet, and tamp it down

occasionally until full. It will settle a little, and will need to be

filled to the top. A circular piece of wood, similar to the one at the

bottom, may be used to centre the rod at the top. This must be done as

soon as the form is filled, before the concrete has had a chance to set.

Use four parts of fine, clean sifted gravel to one of cement. Allow

the form to stand four days. Remove the clamps, and draw the form out

on the ground. Tap it gently, and remove one half of the iron pipe.

Roll it over upon two pieces of board, and remove the other half. The

concrete will be very heavy, and the assistance of a full-grown man may

be needed to draw the form out of the pit.

The inside of the form should be cleaned and thoroughly oiled. This

should always be done before making a column to insure its coming out

easily, as concrete forms a strong bond with iron, and otherwise the

column may be broken in trying to get it out. The result will be a

perfectly round but not perfectly smooth column. It should be coated

with a wash of clear cement and water, using a wide brush. The colour

may be made white by adding a lump of lime to the cement and water,

and two coats of this solution about the consistency of milk will be

necessary. The last coat may be put on after the columns are on their

foundations. The placing of the posts on the square foundations is

heavy work and the help of a labourer should be secured.

These plain posts are not as ornamental as wooden columns, with their

bases and capitals, but they make a very substantial structure that

cannot decay and will last a century.