TENDER CAPACITY

Water 12,000 gals.

Fuel 16 tons]

[Illustration: THE LOCOMOTIVE ENGINEER’S WORKROOM

Here is a picture of one end of the boiler of this giant locomotive.

It would take a man more than seven feet high to bump his head in the

middle of it while standing on his feet.]

[Illustration: This shows a picture of the engineer’s cab of one of

these great railroad machines. We are accustomed to see the levers

and other machinery for operating the engine right in the back of the

engine cab. Over or near the firebox. Upon looking closely we find

that the operating machinery is at the side of the locomotive and

far forward in the cab. In fact there is a complete set of operating

machinery on both sides of the cab, so that the engineer can run the

engine from whatever side he happens to be on. This is very necessary,

particularly in switching. Near the end of the cab where the engineer

used to sit you will notice a peculiar pipe-like arrangement. This

is not for operating the engine, but is the automatic stoker, which

is fully explained in the next picture. An engine of this size will

require seven tons of coal per hour.]

[Illustration: A MACHINE WHICH DOES THE WORK OF FOUR FIREMEN

When these large locomotives were first used it was found that no one

fireman could shovel in enough coal to keep the steam up. It would

require three or four firemen working constantly to shovel enough coal

to keep this engine going. Man’s inventive genius came to the front,

however, and now we have an automatic fireman, so to speak. Instead of

shoveling coal on one of these engines the fireman merely operates a

lever. This is a picture of the Sweet locomotive stoker installed in

a railroad engine. This machine automatically conveys coal from the

tender to the locomotive, raises it by an elevator to a point above the

fire door, dumps it into the firebox and spreads it evenly over the

grate.]

[Illustration: This is the new type of electric locomotive being used

by the New York Central system]

[Illustration: HOW A FAST TRAIN TAKES WATER WITHOUT STOPPING

The fast express trains haven’t time to stop and take water from the

tank at the side of the railroad as in former days. This picture shows

a tank built between the tracks which enables the engineer to fill

his boilers without slackening speed. When approaching this tank the

engineer simply lowers a tube into the water, the end of which is a

scoop. The moving engine thus forces the water up into the tube, from

which it runs into the boiler.]

[Illustration: This is an improved signal tower from which switches are

operated. If you were ever in a signal tower you will not recognize

this as one, for you are used to seeing a room full of levers which the

tower man had to pull hard when he wished to throw a switch. By the old

way the end of the lever was attached to a wire which was connected

with the switch. The wire running through pipes, when the operator

pulled the lever the switch was pulled shut by the pull on the wire. In

this new plan the switch is controlled by electricity, and the operator

has merely to pull out a plug as shown in the picture, which is much

easier than operating a lever.]

[Illustration: WHAT MAKES A WIRELESS MESSAGE GO

Sketch showing arrangement of aerial on ship equipped with the Marconi

Direction Finder, an instrument which tells the sea captain the exact

points of the compass from which wireless distress signals are being

sent and enables ships to avoid collisions in fog.]

The book of wonders · 第 237 / 376 题