III.--THE STORY OF THE LONG FIGHT FOR PURE WATER.

And now we come to the story of the long fight for pure water in

Pittsburgh. The irony of the situation is, that there should ever have

been a long fight in a city which has since 1863 publicly recognized

the danger of impure water, the significance of which has almost

continually been brought before the people by press and platform

alike, for the past fifteen years. The story of the whole filtration

movement cannot be separated from the story of the struggle for

supremacy of contending factions in the dominant political party. And

the result,--excess typhoid with its terrible cost,--becomes part of

the penalty the city has had to pay for such corruption as the present

graft proceedings in councils are bringing to light.

[Illustration]

The situation at the beginning of the filtration movement in 1895-96

was this: One of the strongest political machines in the history

of municipal government was in absolute control in Pittsburgh. It

mattered not who was elected mayor; he had no responsible power.

Heads of departments were appointed by outgoing councils. This meant

that department heads held over, and used their power to re-elect as

in-coming councilmen the outgoing councilmen who had elected them.

Moreover, councils were controlled by the ring.[13] In this way the

political machine was self-perpetuating. The directors of public

works drew specifications for public improvements; councils awarded

contracts; and it is a matter of notorious record that the well-known

firm of which one of the ring leaders was a member usually secured the

contracts.

[13] For an analysis of Pittsburgh politics during this period under

the leadership of Magee and Flinn, see Lincoln Steffens's The Shame of

the Cities.

The municipal election in February, 1896, was hard and bitterly

fought. George W. Guthrie headed the reform party as candidate for

mayor. According to one authority the majority of ballots cast were

for Guthrie, but when the count came in officially a few days after

election, the ring had won. With the mayor, both branches of councils,

and the director of public works all of the dominant party, the

carrying out of their ante-election pledges so far as filtration was

concerned would seem a matter of course.

True to these pledges, a resolution for the appointment of a Filtration

Commission, to include the mayor, the president of each council, and

eight citizens,--making eleven in all,--passed City Councils on June

8, 1896, and was approved by the mayor on June 10.

[Illustration]

The commission was promptly appointed and set to work to make a

thorough investigation into the relative merits of various methods of

filtration and water supplies in use in cities of the United States and

Europe. Allen Hazen, a leading expert on filtration, was employed for

the first phase of the investigation, and Prof. William T. Sedgwick

of the Massachusetts Institute of Technology, eminent as a sanitary

expert, investigated the typhoid situation in the city. Morris Knowles,

C. E., was appointed resident engineer in local charge of all items of

experiment and investigation. Various members of the commission visited

European and American cities to study filtration methods; extended

bacteriological and analytical studies of the Allegheny River water

were made; small, slow, sand filter beds and standard make mechanical

filters were set up at the experiment station to test the relative

merits of each as applied to Allegheny River water; and nothing was

left undone as a means of arriving at a sound conclusion. Over two and

a half years elapsed between the appointment of the commission and the

rendering of its report.

The report, which was very elaborate, was presented at a joint session

of councils on February 6, 1899, and showed that the members of the

commission were united in their belief that, all things taken into

consideration, a slow, sand filtration plant should be constructed.

In accordance with its recommendation steps were immediately taken

for the issue and sale of bonds to provide the necessary funds, a

public election for this purpose being held on September 19, 1899. The

appropriation ordinance for the year 1900 contained "No. 100; for the

purpose of extension and improvement of water supply and distribution,

including the filtration of such water supply, and providing and

furnishing meters to be used in connection therewith ... $2,500,000."

The ordinance authorizing the controller to issue bonds for the

purpose as above specified was passed by Select Council in March, and

approved by the mayor April 3. So that prior to May 1, 1900, a fund of

$2,500,000 became available, and the prospect for the prompt erection

of the plant would have been bright, but for the fact that during the

four years since 1896 certain changes in the attitude of the members

of the ring toward one another had taken place, that were destined

to involve further complications. One member (Magee) had aspirations

toward the United States Senate. In this he encountered opposition from

the other end of the state, and in the struggle for state supremacy

that followed, Pittsburgh was left largely to another member of the

ring.

[Illustration]

In the early part of 1900 E. M. Bigelow, who for a long time had been

director of public works, had a row with this leader (Flinn) over

certain matters of public work. The result was that on June 11, 1900,

the ring-controlled councils threw Mr. Bigelow out of office and

elected as director of public works a man more friendly to the ring.

This break between Flinn and Bigelow was the beginning of the long

series of events that retarded the filtration movement for at least

four years.

Bigelow was now "out." The new director of public works, appointed

by councils was acceptable to the ring that was "in"; so was the

membership of councils. The question with Bigelow was, naturally, how

to get back into office. This is the way he accomplished his desire.

The ousted director had a brother, who, it is said, had an old grudge

against the ring. He went to Harrisburg and prevailed upon the

State Legislature to grant Pittsburgh a new charter, abolishing the

office of mayor and substituting that of recorder, this office to be

filled by the governor until April, 1903, when the regularly elected

recorder would come into office. The charter also gave the recorder

much larger powers than the mayor had previously enjoyed, among them

the appointment of heads of departments and the right to enter into

contracts hitherto the prerogative of councils alone.

[Illustration]

As might be expected, the newly appointed recorder soon exercised the

authority vested in him by the terms of the new charter, and on June

11, 1901, removed the head of the department of public works again

installing Mr. Bigelow in that important position, just one year after

he had been removed by councils.

It must be remembered that while Mr. Bigelow had again secured the

directorship of the Department of Public Works, there had been no

change in councils, which were still enrolled on the side of the

ring. While councils could not now stop the preparation of plans and

specifications for the proposed filtration plant, they could make a lot

of trouble in other ways; and so they did.

There are contradictory statements at this time as to just how much

progress had been made on plans during the year that Mr. Bigelow was

out of office. One side claims that "sixty per cent of the plans had

been drawn"; the other said, "only part of the plans." At any rate,

within six weeks Mr. Bigelow removed the engineer who had served under

his immediate predecessor, appointed as resident engineer Morris

Knowles (who was later appointed chief engineer of the newly created

Bureau of Filtration), and directed him to start work on plans for the

filtration plant.

At the same time councils proceeded in an attack on the director for

alleged delay in the preparation of plans; and on November 11, 1901,

presented a report to its filtration committee declaring Mr. Bigelow

entirely responsible for all the delay in the preparation of plans

and specifications, adding that these delays had been "gross and

inexcusable." This report was accompanied by a resolution ordering

Director Bigelow to furnish within ten days, to the filtration

committee, for its approval, all the plans and specifications for the

work lying north of the Western Pennsylvania Railroad, directing him

further to proceed with the utmost diligence to the completion of the

plans and specifications for the remainder of the plant, and to submit

the same to the filtration committee on or before December 2, 1901. The

report and resolution were adopted by both councils on the day of their

presentation. The real motive for this attack is readily inferred.

[Illustration]

In the meantime the opposing faction had been working with the

governor, and after a notorious meeting at the Duquesne club, the

governor was prevailed upon to remove his first appointed recorder, on

the pretext that he had displaced several old soldiers from office,

and to appoint another recorder in his place,--this time a man upon

whom the machine could rely. At the close of the letter of removal, the

governor added a now famous postscript, "I was not bribed."

With the appointment of the new recorder, Bigelow was again forced out

of the office of director of public works. This put the ring again in

full control, with even greater powers than it had before. A year and

a half had elapsed since the $2,500,000 became available, and all that

the people had to show for it were eighty-five acres of land, part of

the plans and specifications completed, and over 600 more deaths from

the scourge of typhoid fever.

The next move was made within ten days after Director Bigelow's

dismissal, when another ordinance for the letting of the contract was

introduced. It quickly passed both councils and received the recorder's

approval. By this ordinance the contract was not to exceed $1,500,000

and was to be for the construction of "so much of the filtration plant

as is shown upon the drawings and description in the specifications, as

and to be known as contract No. 1."

[Illustration]

Under this ordinance the new director advertised for bids, which were

received and opened. It appeared that the lowest bid was made by the T.

A. Gillespie Company, at about $1,292,000. The director and recorder

were preparing to let this contract for part of the work to the

Gillespie Company, and it looked as though the faction of the ring now

in the saddle would win the stakes.

But they had not reckoned all the odds. The opponents of the ring,

in this two-sided hold-up game, brought out another winning card. It

was in the person of John P. Edgar, a citizen of Steubenville, Ohio,

but the owner of property in the thirty-seventh ward, Pittsburgh, who

entered suit in the United States Circuit Court at Pittsburgh for an

injunction to restrain the recorder and director of public works from

awarding the contract. The case was argued before Judge Buffington on

March 3, 1902, W. B. Rodgers and George W. Guthrie appearing for the

plaintiff, and Thomas D. Carnahan, city solicitor, for the city. Suit

was based on the allegation that no estimate had been presented to

councils for the whole cost of the improvement, and that the letting

of this partial contract would be in violation of the new charter,

which required that before any contract for public improvement could

be entered into, such an estimate for the entire cost must have been

presented. The city solicitor showed that an estimate had been made

of the entire cost, but this estimate had not been made public or

submitted to councils. Mr. Rodgers maintained that this estimate must

be submitted to councils and approved by them. He and Mr. Guthrie

also claimed that the contract should embrace the completion of the

work. On March 13, 1902, Judge Buffington issued the injunction prayed

for. The court held that the estimate of the whole cost, required by

the charter, must be made to councils and become a matter of public

information, and that such an estimate had not been made.

[Illustration]

The machine was temporarily blocked, but five days after the injunction

had been granted, the recorder instructed his director of public works

to have blueprints, plans and estimates of the entire filtration

system ready to present to councils at as early a date as possible,

thus starting the necessary legal steps for placing a new contract.

Within a month these plans and estimates, involving an expenditure

of $3,635,500, were prepared and submitted to councils, and three

ordinances for the letting of contracts were presented. The increase

over the first estimate was explained as due to an increase in the

number of services to be metered, and to a general increase in the cost

of materials.

These three ordinances were indefinitely postponed, however, in

councils, because more money for the construction of the plant under

the increased estimate was not available.

The next hold-up came from the city controller, who on May 1, 1902,

sent the following letter in duplicate to Recorder Brown and Director

McCandless:

In view of the uncertainty attending the proposed filtration of

the water, and the doubt as to the ultimate disposition of the

matter by councils, this department desires to notify you that

on and after May 10, no indebtedness against that appropriation

for any purpose, except for labor or supplies previously

furnished, should be incurred, as, under the decision of the

court, there is now no authority for any expenditure for

filtration purposes.

In the meantime, about April, 1902, and all through that summer,

advocates of a mountain water supply were at work. At the same time

changes in councils threw out of the Filtration Committee members

favoring sand filtration and elected opponents of the plan to its

membership. The result was that on July 21, 1902, an ordinance was

brought forward authorizing the Filtration Committee to prepare, in

conjunction with the superintendent of the Bureau of Water Supply, or

some other competent engineer designated by the director of public

works, estimates showing the entire cost of the installation of the

proposed sand filtration plant. Early in January, 1903, this resolution

had passed both councils. It was, however, vetoed by the recorder on

the ground that it was unnecessary, the Department of Public Works, he

held, having already furnished full estimates, in good faith, and being

ready to assist councils further in any manner that might be suggested.

The recorder added in his veto: "If the purpose of this resolution

is ultimately to defeat the proposed plan of sand filtration and

substitute therefor a system of mechanical filtration, I am unalterably

opposed to it." An attempt to pass the resolution over the recorder's

veto was made, but it failed for lack of the necessary three-fifths

vote.

[Illustration]

In the meantime an ordinance was presented authorizing a public

election for a bond issue large enough to cover the difference between

the amount of money then available and the amount required under

the increased estimate. All that came of this was an inquiry by the

sub-committee to which it had been referred as to whether the new

estimate included coverings for the filter beds, and whether the South

Side was to be given filtered water. After ten months' further delay,

this sub-committee reported that the estimate did not provide for

covered filter beds and that it made no provision for the South Side.

Another year and a half had elapsed, with 650 additional deaths from

typhoid fever; 1,250 to date.

[Illustration]

In April, 1903, by the election of Mayor Hays, the Bigelow faction

again came into power and Mr. Bigelow was reappointed director of

public works. Councils reorganized. A reform, or Bigelow man, was

elected to the presidency of councils, control of committees was

secured, and by the middle of 1903, the Bigelow faction was again in

full power.

By this time the South Side was demanding filtered water. The new

estimates presented by Director Bigelow in September, 1903, included

ten filter beds for the South Side, and the raising of the pumping

capacity for the first twenty-three wards by twenty million gallons,

and included also, new machinery and boilers for the Brilliant pumping

station, and a fifty-inch steel main across the city to supply the

South Side and the Monongahela River wards of the old city. These

brought the total new estimate up to over seven million dollars.

The time between September 21, 1903, and January 12, 1904, was

required to get a resolution through councils and approved by the

mayor, authorizing the finance committee to employ three experts, Col.

Alexander M. Miller of Washington, John W. Hill of Philadelphia, and

Rudolph Herring of New York, "to verify and make a report on or before

March 1, 1904, to the committee on finance, as to the correctness of

the estimates made by the director of public works."

Under this resolution the experts were employed and went to work. In

the meantime, councils had received a petition from the Pittsburgh

Section of the American Chemical Society, urging the establishment of a

sand filtration plant; also a resolution of the Civic Club of Allegheny

county, and a resolution of the permanent civic committee of the

women's clubs of Allegheny county, urging sand filtration at an early

date.

During 1903 there were 450 deaths from typhoid fever.

On February 27, 1904, the filtration experts made their report

recommending a receiving basin, three sedimentation basins, a clear

water basin, and forty filter beds. They also recommended sand

filtration and covers for filter beds, but cut down the capacity of the

various parts of the plant sufficiently to reduce the estimated cost by

$700,000.

On March 31, 1904, the Bureau of Filtration in the Department of Public

Works was created for the purpose of constructing these important works.

No further opposition of a serious character was met, and in July of

that year a second bond election for $5,000,000 was held and passed

by a vote of nearly two to one. These bonds were issued in September;

plans and specifications for the enlarged plant were prepared as soon

as possible; bids were advertised; and the contract was let on March 4,

1905.

With the final award of the contract the fight for pure water was

practically won. Director Bigelow again stepped out of office in 1900

with the election of a mayor independent of either Republican faction;

but the work of pushing the plant forward to completion was carried

on by the Guthrie administration under the efficient supervision of

Directors Clark and Shepherd, and Superintendent Knowles; so that by

October, 1908, the plant was supplying a good quality of filtered water

to the first twenty-three wards,--the old city.

The settling of the pending litigation between the city and the

Monongahela and other private water companies on the South Side,

together with the taking over of that property by the city was all that

remained to be done before filtered water could be supplied to that

part of the city.[14]

[14] In January, the Monongahela Water Company notified the city of its

decision to abide by the decree of the Supreme Court, which granted

permission to the city to take possession of this plant and system in

consideration of $1,975,000.

In the meantime the North Side (Allegheny City) still has unfiltered

water. Immediately after Allegheny was annexed to the Greater City

in December, 1907, steps were taken to pave the way for filtered

water there. $750,000 was appropriated for ten extra filter beds

on city-owned land adjoining the plant, and their construction is

now under way. Their use for the North Side involves extra pumping

facilities, however. A plan to bring the old Allegheny pumping station

at Montrose down to Aspinwall for this purpose was recently blocked

by members of councils from the North Side. Satisfactory explanation

for this action does not seem to be forthcoming. The reason alleged

was that its removal would throw some of the men out of a job. In

the meantime Allegheny continues drinking unfiltered water with

no immediate prospect of relief, and the same sort of political

influence that delayed filtration in the old city so long, seems to be

accomplishing similar results on the North Side.

* * * * *

In conclusion, let me apply the economic facts brought out in the first

section of this article, to the four years of unnecessary delays in the

construction of the filtration plant, from April 3, 1900, to April 29,

1904. They must be considered in making up the whole bill of the city

in the cause of pure water.

During all this time, more than $2,200,000, on which the city was

paying three and one half per cent interest, was lying in the banks

favored by the administration, bringing the city but two per cent;

and the death rate from typhoid fever was the highest of any of the

large cities in the United States. But for this delay the plant might

have been brought to completion on January 1, 1904, or at least as

far advanced as it was January 1, 1908, and four years,--1904, 1905,

1906 and 1907,--of excess typhoid fever might have been avoided. Not a

startling statement, perhaps, on the face of it. But consider seriously

what these four years of excess typhoid fever have meant to the people

of Pittsburgh in deaths and economic cost. I have told you of but half

of the people of six wards out of forty-three, one year out of four. In

1904, with an estimated population of 352,852, there were 503 deaths

from typhoid in Pittsburgh. Cities with a fairly pure water supply

do not have over twenty-five deaths annually per 100,000 population

from typhoid. Had Pittsburgh's typhoid fever death rate in 1904 been

twenty-five per 100,000, there would have been but 88 deaths instead

of 503, and the grim total of 415 lives would not have been blotted

out. By allowing $2,000 as the cost in loss of wages and expenses for

each death (a little under the actual costs in the concrete study of

economic cost already given), and allowing our previous minimum of

$4,000 as the value of each life, the total excess deaths in 1904 alone

from lack of pure water was a loss to the community of $2,490,000.

There were 425 unnecessary deaths in 1906, and a wastage of $2,550,000;

289 unnecessary deaths in 1905, and a wastage of $1,734,000; 415

unnecessary deaths in 1904, and a wastage of $2,490,000. In the four

years the community lost $9,000,000,--over $4,000,000 more than the

cost of the filtration plant. And in those four years, 1,538 lives were

unnecessarily sacrificed.

There are those who will say, and perhaps rightly, that Pittsburgh's

filtration plant of to-day is the magnificent triumph of construction

that it is, only because of those years of delay in shaping the final

plans; that while those who fought the measure tooth and nail for

so many years did not have that purpose in mind, yet the set-backs

they were able to accomplish, have made in the end for a larger,

better, more efficient and more far-serving plant than could have been

possible, had the first plans been carried hastily to completion. Such

may be the case. If so, let the people be thankful that the cause of

pure water triumphed ultimately over a lethargic public sentiment,

selfish political purposes, and municipal shortsightedness. Let them

at the same time remember at what cost to themselves and to their city

the fight was won. And let the plant itself stand as an object lesson

of tardy justice, and a monument to those hundreds of lives that paid

the penalty unwillingly and unknowingly of being part and parcel of an

unaroused municipal conscience.

[Illustration: GROSS NUMBER OF TYPHOID CASES, 1885 TO 1907.

GROSS NUMBER OF TYPHOID CASES AND DEATHS REPORTED IN PITTSBURGH FROM

1885 TO 1907]

Charities and the Commons: The Pittsburgh Survey, Part II. The Place and Its Social Forces · 第 129 / 139 题